About a week and a half ago I laid a little under 1000 sqft of tahoma 31 in my backyard. This was the culmination of a ton of research reading/posting here, and a LOT of manual labor. I can't fit any equipment through my side yard bigger than about 30", so a lot of moving of dirt was done manually or with undersized equipment. Thank god it's only 950 sqft cause our soil was heavily compacted and rocky. Anyway, after weeks and weeks of clearing and moving dirt around, here it is being laid!
We had contractors working on some DG in the side yard, so I left a walk way (this turned out to be fun later)
Why do I always do things the hard way? LOT of cutting to do to fill in this zigzag
Sod all laid! Took about 6 hours with some breaks and chit chats with family as they came to see the process.
Please pray with me that we get enough sun 😆
We had contractors working on some DG in the side yard, so I left a walk way (this turned out to be fun later)
Why do I always do things the hard way? LOT of cutting to do to fill in this zigzag
Sod all laid! Took about 6 hours with some breaks and chit chats with family as they came to see the process.
Please pray with me that we get enough sun 😆