Curious other’s thoughts on getting bare dirt level for sprigging.
I broke all the ground up, did the major leveling with Harley rake/box blade. Then took drag harrow and went over yard in circles 1,000x
now into the finish leveling.
I have a 10’ wide metal leveling drag (exact one the lawn rebel has a video on how to make). Was going to do circles with that to try and finish the get as level as I can.
Recommendation on whether to roll with a drum to push it all down or leave the dirt “fluffy” for sprigging?
tools I have are
Drag harrow
Drag level
Tow behind drum
Tractor/box blade
Atv
I broke all the ground up, did the major leveling with Harley rake/box blade. Then took drag harrow and went over yard in circles 1,000x
now into the finish leveling.
I have a 10’ wide metal leveling drag (exact one the lawn rebel has a video on how to make). Was going to do circles with that to try and finish the get as level as I can.
Recommendation on whether to roll with a drum to push it all down or leave the dirt “fluffy” for sprigging?
tools I have are
Drag harrow
Drag level
Tow behind drum
Tractor/box blade
Atv