Normally if I were doing a split program with Dimension, I'd be putting down the second half now. In this case, it's the same idea, but I've been using Tenacity on the front for this Spring instead of Dimension. I'm now at the point where I need to put down a half app of Dimension granular this week to last another 2 months or so. I just planted some grass plugs last week. They've almost rooted, for the most part.
Has anyone put down Dimension so soon after plugging, and how were your results? If I really wanted to, I could block those areas by putting something on top of them when I spread the Dimension, but it's a lot of work that I'd rather avoid if I can get away with broadcasting normally.
Has anyone put down Dimension so soon after plugging, and how were your results? If I really wanted to, I could block those areas by putting something on top of them when I spread the Dimension, but it's a lot of work that I'd rather avoid if I can get away with broadcasting normally.